Work Package 5 - Analysis Integration

“Work Package 5 has the primary goals of

  1. coordinating, and
  2. integrating the THELMA project workflow,

which includes the following areas:

  • Completing vehicle characterization not already performed in WP1 or WP1, including especially
    • Emissions transport and damages from vehicles
    • Resource burdens
    • Social indicators (risk, etc.)
  • Design national transportation scenarios, including particularly
    • New vehicle penetration into the vehicle fleet, and
    • Scenarios forecasts for transportation demand.
  • Coordinate project design and data interchanges between the other work packages on both the vehicle and scenario levels, e.g.
    • Criterion and indicator set design
    • Combining vehicle efficiency and transport demand to present net grid demand by location and time-of-day.
  • Integrative analysis of results for both vehicles and scenarios, including;
    • Total cost analysis, including both internal & external costs,
    • Tradeoff analysis of competing criteria, and
    • Multi-criteria decision analysis, incorporating individual stakeholder preferences to produce vehicle and scenario rankings.